UTE Paulínia Verde’s entry into commercial operation marks the first biomethane-fired thermal power plant to secure capacity contracts through Brazil’s 2026 capacity auction mechanism. The commissioning in Paulínia, São Paulo state, coincides with expanding biogas infrastructure in the region and adds dispatchable renewable generation to the national grid. The project demonstrates commercial viability of biomethane conversion at utility scale as Brazil seeks to integrate variable renewable sources.