Chile’s major industrial electricity consumers are pressing the national energy regulator to redistribute transmission infrastructure costs and tighten battery compensation frameworks, arguing that current payment structures threaten competitiveness in mining and manufacturing. The intervention comes as battery storage proliferates across the national grid and transmission expansion accelerates to accommodate renewable capacity. The outcome will shape capital deployment in grid infrastructure and influence how operational costs flow through to energy-intensive industries over the next investment cycle.