San Matías Pipeline closed a $900 million syndicated loan to build a 472-kilometer pipeline connecting Vaca Muerta gas fields to Río Negro’s Atlantic coast, enabling Argentina’s first large-scale LNG exports from late 2027. The project finance structure, arranged by Citi, JPMorgan, Santander and Itaú, marks Argentina’s inaugural international financing for LNG infrastructure without sovereign guarantees, signaling creditor confidence in long-term offtake contracts backing the Southern Energy export venture.