Ecuador’s largest hydroelectric plant Coca Codo Sinclair saw river flow decline to 179 cubic meters per second on October 2, 2026, well below the 240-250 m³/s required for continuous generation near 1,200 MW. The government extended mandatory disconnections for high-voltage industrial consumers to 72 hours as the Mazar reservoir level dropped to 2,131.5 meters above sea level, now 21.5 meters below maximum capacity. The combined reduction in hydroelectric availability during the 2026-2027 dry season poses increasing pressure on Ecuador’s electricity supply through December.